Mississippi State University

Table of Contents

Locations

  1. Academic and Administrative

    1. Swalm Chemical Engineering Building

      Swalm Chemical Engineering

       

      The Swalm Chemical Engineering building was completed in 2001 and is the newest addition to the Drill Field. Classrooms, labs and office space for the Dave C. Swalm School of Chemical Engineering are all contained here. Swalm mirrors Lee Hall, as they sit opposite each other on the Drill Field.

       

      323 Presidents Cir.

      GEO: 33.452690-88.789810